Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Info |
---|
This page outlines how to add a budget to a non-financial database, for use in Phocas Analytics, using the Easy Budget Upload method. If you want to add a budget file for use in Phocas Financial Statements, see Add a budget file to a financial database. |
Info |
---|
The Easy Budget Upload method is a simpler way to add a budget to a database, as Designer automatically detects the budget file and converts it into the required format. Depending on how the data in your source file is arranged, this method might not be suitable, for example, if it contains pivoted data. If that is the case, you need to add the budget the same way you would add any other type of item, and ensure you check the date format. |
1. Get the raw data
Export the raw data from the underlying database into a Microsoft Excel file. The data might come from Phocas, your ERP system or another source.
2. Prepare the budget file
Prepare the data in the budget file according to the requirements outlined below, to ensure it is in the correct format for uploading to Phocas.
The basic requirements are:
The raw budget data must contain only a single measure.
Codes should be used, not names, for example, Rep007, not Justin Time.
The following table gives is an example of a typical budget in the required format:
Sales Rep | Region | Jan 2018 | Feb 2018 | Mar 2018 | Apr 2018 |
---|---|---|---|---|---|
Rep007 | 41 | 10,000 | 12,000 | 10,000 | 15,000 |
Rep007 | 42 | 5,000 | 7,000 | 5,000 | 10,000 |
Rep008 | 41 | 22,000 | 22,000 | 20,000 | 28,000 |
Other requirements are as follows:
Expand | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||
If the selected database is summarized by a custom period type that is not aligned with calendar periods, such as a fiscal period, ensure that the date column (YYYY-MM-DD), especially the day of the month, or DD, takes into account the appropriate fiscal period start date. This ensures your budget stream is summarized using the correct date range. Example of a typical budget in the required format when using a custom period type such as fiscal period:
|
Expand | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||
The column headers in the data source must be in one of the following date formats:
|
3. Save and close the budget file
Save the budget file in CSV (preferred) or XLXS Data format, then close the file.
4. Upload (or sync) the budget file
Open Designer in Phocas, then either upload or sync the file (see Get your data into Phocas). Either way, ensure you select the File has header row checkbox, to enable Designer to recognize the file as a budget file.
If you are creating a Balance Sheet budget, in addition to the budget file, you need to upload the opening balances. This data can be in the same file or a separate file.
5. Add (connect) the budget file to a stream
In Designer, click the New Stream tab.
Click the Edit button in the new stream tab, enter a more suitable name for the stream (such as Budget) and click Save.
Expand the data sources panel on the right and locate the budget file, then drag it into the stream’s Drag here box.
Designer recognizes that you are loading a budget-type file and displays a message to that effect. Click Yes.
Image RemovedImage AddedDesigner converts (unpivots) the budget data into the required format and displays it in the new stream tab. All the dated columns are changed into a Moment column and a Measure column.
6. Map the budget data
Map the data in the budget file to the corresponding elements in the database. Typically, you need to map over the top of existing dimensions and measures.
Value → Measure > Value
Moment (date/period) → Date
7. Save and build the database
Save your design changes and build the database to apply those changes. You can either build the database now or schedule a build for later.
8. View the budget
View the budget in Phocas Analytics by selecting it as a stream , or choosing stream from the mode buttonor selecting Stream mode. See Change the stream and Use Stream mode for more information.
Process steps
Table of Contents | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Panel | ||
---|---|---|
| ||
Video |